Construction
Some sort of track reconstruction going on at Golf Junction; a panel of track to the west and a couple of panels of track to the east have been removed, and at least on the east the roadbed has been trenched & reballasted, and now has one panel ready to be slid into place and bolted into place. Perhaps this has something to do with the Springwater Trail & 17th Ave bike path?