Trolley (construction) picture of the day
When the Sellwood Bridge was replaced, the old Oregonian Rwy track under it (and a quarter to half a mile north, and a quarter to half a mile south) was ripped out so that it wouldn’t get in the way of the construction process. Now that the bridge is basically done (as far as I can tell the only thing left to do on the bridge is to finish the east end of the south sidewalk) the track is being replaced.